Location: Boston College
GC: Lee Kennedy Company
Architect: Einhorn, Yaffee and Prescott
Our Scope of work was to provide the insulation, air and vapor barrier to the inside face of exterior walls, in the chapel area.
Right: An "extra" vapor barrier was applied to the spray foam. This was done because the chapel area was being converted into Computer "server" area and will be very sensitive to moisture.